
The Quick Read: Pre-approval for a new build is ordinary conventional underwriting. The lender checks your credit, income, assets and debts against the same rules it would use for an existing home. Nothing construction-specific happens at this stage except choosing a loan structure. The new-build rules show up later, at the appraisal, the completion check and the conversion to a permanent loan.
That surprises many buyers. They expect a special construction pre-approval with its own hurdles. There isn’t one. What changes is how long your approval has to hold up, because the house doesn’t exist yet and the finish line is months away.
Conventional payment estimate
The starting figures are an example price at the first-time buyer’s minimum down payment. Replace them with yours.
Editable benchmark: 7.32% as of October 22, 2026 · Freddie Mac 30-year average via FRED®. A conventional market reference, not a conventional loan quote.
Estimate seeded at the low end of Fannie Mae’s published range (0.58%–1.86% a year); the insurer prices the actual premium on the score and the leverage. Applies only above 80% loan-to-value.
Illustrative starting assumptions: a $350,000 price, the first-time buyer’s minimum down payment, a thirty-year term at the current Freddie Mac benchmark, mortgage insurance at the low end of Fannie Mae’s published range, and property taxes and insurance estimated at typical national rates. Every field is editable.
Illustrative estimate only — not a Loan Estimate, approval, quote, or commitment to lend. The rate field carries the weekly Freddie Mac thirty-year conventional benchmark, a market reference and not a conventional loan quote; your rate is set by the lender at lock. The mortgage insurance figure is an editable estimate seeded from Fannie Mae’s published typical range, not a premium quote; the insurer prices the actual premium, and the cancellation month assumes scheduled payments with no extra principal and no change in value. Taxes, insurance and dues are editable estimates; closing costs are not included. Conforming loan limits apply by county. Licensed in sixteen states for consumer mortgages.
This guide walks through the mechanics start to finish: what is checked, how the file is underwritten, the two main loan structures, where the usual rules break, and what you actually decide along the way.
What a Pre-Approval Is (and Isn’t)
A pre-approval is a lender’s written review of your verified finances, with a maximum loan amount attached. It is not a final approval and not a commitment to lend. Final approval comes only after the property is appraised, the title is clean and the full file is reviewed.
It also differs from prequalification. Prequalification is a quick estimate based on numbers you report. Pre-approval means you handed over documents and the lender verified them.
| Stage | What you provide | What it means |
|---|---|---|
| Prequalification | Self-reported figures | A rough estimate only |
| Pre-approval | Verified documents | A ceiling, subject to review |
| Final approval | Appraisal, contract, title | The loan can go to closing |
Is it required? No law requires it. Many builders ask for one before they will hold a lot or sign a contract, because it shows you can finance the purchase. Treat it as your budget and your credibility.
What the Lender Verifies
The lender verifies six things: identity, income, employment, assets, debts and credit. Each one answers a specific question, which is why the paperwork feels repetitive but isn’t random.
- Identity: a government ID and Social Security number confirm who is borrowing.
- Income: recent pay stubs, W-2s and traditional personal-income documentation shows what you earn. Self-employed borrowers typically add business returns and a profit-and-loss statement.
- Employment: the lender confirms the job is stable and likely to continue.
- Assets: bank and retirement statements show cash for the down payment, closing costs and reserves. Reserves are money left over after closing. Large unexplained deposits get questioned, so keep a paper trail.
- Debts: cards, auto loans, student loans and other obligations feed your debt-to-income ratio.
- Credit: the lender pulls your credit report, usually a hard inquiry.
Gift funds are allowed in some cases, and the donor typically signs a letter confirming no repayment is expected. Rental history can also help if your credit file is thin.
How the File Gets Underwritten
Most files run through an automated underwriting system built by the agencies that back conventional loans. Fannie Mae’s version is called DU and Freddie Mac’s is called LPA. You enter your numbers, and the system returns a finding based on the whole picture.
Across the conventional programs Lendmire arranges through wholesale lenders, the framework looks like this. These figures are subject to lender guidelines and full file review.
- Credit: the wholesale programs start at a 620 decision score. An adjustable rate under manual underwriting starts at 640.
- Debt-to-income: the automated finding governs most files, with a total ratio ceiling of 50%. Manually underwritten loans use 36% or 45%, depending on reserves and score factors.
- Down payment: a first-time buyer on a one-unit primary home can go to 97% LTV (3% down) with a fixed rate. Standard purchases go to 95% LTV (5% down). LTV, or loan-to-value, is the loan as a percentage of the home’s value or price.
- Mortgage insurance: required above 80% LTV. You can request cancellation at 80% of the original value with good payment history, no second liens and no drop in value. The servicer must end it automatically at 78%.
Past credit events carry agency waiting periods: four years after a chapter 7 discharge, seven after a foreclosure, and four after a short sale or deed-in-lieu. Documented extenuating circumstances can shorten them.
If you want the program side in one place, Lendmire’s conventional loan programs page lays out the options.
The agencies publish these limits in their eligibility rules. The Fannie Mae Eligibility Matrix shows that for a one-unit principal residence, the maximum LTV for a purchase is 97% on a fixed rate and 95% on an adjustable rate. Those are agency caps. Your own approval can land lower.
The Two Structures: One Close or Two
Here is where new construction actually differs. Fannie Mae supports two construction-to-permanent structures, per its Learning Center.
Single-closing. You close once. That one closing covers both the construction financing and the permanent loan. The lender manages payments to the builder during the build. Because the permanent terms are already in your loan documents, the loan converts automatically when construction is complete. You underwrite once and pay one set of closing costs.
Two-closing. You first close a separate construction loan. When the home is finished, you close again on a permanent loan, processed as a refinance. That means a second underwriting and typically a second set of closing costs.
The same page of Fannie Mae’s matrix explains the transaction types: single-closing loans are processed as purchases or limited cash-out refinances, while two-closing loans are processed as cash-out type refinances.
Freddie Mac has its own version. Its Guide section 4602.2 describes “One-Time Close” loans, where the permanent note is signed when the interim construction financing closes. The loan then converts, either automatically or through a single modification. The construction phase is structured as a temporary loan, and the permanent loan is underwritten on its own terms.
Buying a finished or nearly finished home from a builder is simpler. That is a normal purchase. The new-construction appraisal and completion rules still apply, but you skip the construction-loan structure entirely.
What Changes Because the House Isn’t Built Yet
Your credit and income review looks the same. These items are different.
The appraisal. For new or proposed construction, the appraiser can work from plans and specifications or from a comparable model home. The home is valued “as completed” and “subject to” completion. In a single-closing loan, leverage is measured against the lesser of the purchase price (construction cost plus lot) or the appraised value.
The land. Guidance for these loans generally expects you to own the lot before construction starts, either already or as part of the transaction. Confirm how your lender treats lot equity toward your cash contribution.
Completion. The lender must verify the home is finished before the loan is sold to the investor. The agencies are moving to a new appraisal data standard that retires old form numbers, so don’t fixate on form names. What matters is that someone documents completion.
Postponed items. A few small unfinished items, like landscaping, can sometimes be handled after closing. These need an escrow and a certification. They are a narrow exception, not a way to close on a half-built house.
Timing. The investor cannot buy a single-closing loan until construction is complete and the loan has converted. The lender carries the loan during the build. If the home stalls or a lien appears, conversion stalls with it.
Where the Usual Rules Break
Several edge cases catch buyers off guard.
- Condos and co-ops. Per the Fannie Mae matrix, co-op units and attached units in a condo project are not eligible for construction-to-permanent financing. A unit in a new condo project also has to sit in a project that is substantially complete, meaning a certificate of occupancy exists and the buildings in the legal phase are finished.
- Cash-out. Fannie Mae processes single-closing loans as purchases or limited cash-out. Freddie Mac allows cash-out on its construction product for site-built homes only. The two programs differ, so a loan that fits one may not fit the other.
- Manufactured homes. A new manufactured home not yet attached to land can be appraised on plans or a model, with a completion certification required. Freddie Mac also covers a new one-unit manufactured home never attached to a foundation.
- Second homes and investment property. Occupancy changes leverage. Don’t carry the primary-residence numbers over. Second homes top out at 90% LTV on the standard purchase rules.
- Changing the terms. Freddie’s structure allows a limited modification at conversion. Changes beyond what is permitted push the loan into a two-closing structure.
What Can Break an Approval During a Long Build
A build runs many months, and your pre-approval has to survive the wait. Documentation gaps cause more trouble on these files than credit problems do. Here is the usual failure list.
1. New debt. A car loan or a card balance raises your debt ratio. Hold off on financing anything until you’ve closed.
2. A job or income change. Employment is re-verified before the loan converts.
3. Aging documents. Credit and income documents have an age limit. The limit can be extended when conditions are met, but a long delay can trigger requalification. Fannie Mae changed its single-close rules in an announcement to address credit and valuation risk, including requalifying when updated documents or LTV change. Freddie Mac allows substantially longer document ages for qualifying One-Time Close files.
4. A low appraisal. If value comes in under cost, leverage changes. Mortgage insurance can change with it, and you may need more cash.
5. Liens or an unfinished home. All construction liens must be satisfied, and the home must actually be complete.
Your closing costs can also move. For new construction where settlement is expected more than 60 days after your original Loan Estimate, the lender may reissue disclosures. The CFPB’s TRID FAQs also explain that a lender can treat a construction-permanent loan as one transaction or as separate ones, so you may see one combined set of disclosures or separate sets. Read each Loan Estimate carefully. The construction-phase numbers can differ from the permanent loan.
A Worked Example (No Dollars, Just Percentages)
Say you are a first-time buyer building a one-unit primary home. You choose a single-closing structure and put 3% down, which is the maximum leverage for a fixed-rate first-time purchase on the schedule above. Terms depend on the lender’s guidelines, the property type, the leverage, and a full review of the credit profile.
Your pre-approval comes back with a decision score above the 620 floor and a total ratio well under the 50% ceiling. Because you are above 80% LTV, mortgage insurance applies, and it comes off later per the 80% and 78% rules. The exact numbers vary by lender and program and follow a full review of property, leverage, and credit.
Then the project moves forward. The appraisal supports the cost of the home plus the lot. Leverage holds. Months later, the lender re-checks your documents and employment before conversion. Nothing changed, so the loan converts to the permanent terms already written into your documents.
Now change one detail. Suppose the appraisal comes in below the cost of the home and lot. Leverage is measured against the lesser figure, so your LTV climbs. You either bring more cash, renegotiate with the builder or reconsider the structure. The pre-approval didn’t fail. It was a ceiling, and the appraisal moved the real number.
Reading Your Pre-Approval Letter
A pre-approval letter usually lists the maximum loan amount, the loan type and term, conditions, an expiration window and your lender contact. Treat the amount as a ceiling, not a target. Your comfortable budget is often lower.
The conditions matter as much as the number. They tell you what must stay true until closing. Ask the lender how long the letter stays valid and how renewal works, because a long build can outlast it.
Key Terms Defined
Pre-approval: a lender’s written review of your verified finances, with a maximum loan amount, not a commitment to lend.
Single-closing loan: a construction-to-permanent loan where you close once and the loan converts automatically when the home is finished.
Two-closing loan: a separate construction loan followed by a second closing on a permanent loan.
LTV (loan-to-value): the loan amount as a percentage of the home’s value or price.
Reserves: money you still have after closing, which lenders count as a safety cushion.
Conversion: the point where a construction-phase loan becomes the permanent mortgage.
What Your Decision Looks Like in Practice
Your real decisions are few. Pick single-closing or two-closing. Decide how much cash cushion to hold for a low appraisal. Keep your finances frozen until the loan converts. And ask your builder whether a preferred lender is required or only encouraged, since that is a business choice you can usually compare against other options.
Gather your documents before you apply, so the lender’s review isn’t waiting on you. If you want a deeper look at how closing costs and builder contributions interact, Lendmire’s piece How Much a Seller Concession Saves on a New Construction Conventional Loan covers it. Tax treatment can depend on your situation; borrowers should speak with a qualified tax professional before relying on any deduction or credit.
If you are buying a home and want to see whether a conventional loan fits your file, Lendmire can help you compare the options and what each one asks of the file. Reach the team at 828-256-2183.
Frequently Asked Questions
Do I need a pre-approval before I sign a builder contract?
No law requires it, but it is a smart first step. Many builders ask for one before they commit a lot or sign. It also tells you what budget the lender will support before you fall for a floor plan.
Does getting pre-approved hurt my credit?
It usually involves a hard credit inquiry, which can cause a small, temporary dip. Mortgage inquiries made while you shop are typically treated together when scored. Don’t open new accounts during the process.
Can I use land I already own toward my down payment?
Often yes, in the sense that lot equity can count toward your cash contribution. How it counts depends on the lender and structure. In a single-closing loan, leverage is measured against the lesser of cost or appraised value, so confirm the details early.
What happens if my appraisal comes in low?
Leverage is measured against the lesser of cost or value, so your LTV rises and you may need more cash. Mortgage insurance can change too. You can bring cash, renegotiate with the builder or revisit the structure.
What if the build takes longer than expected?
Your documents have an age limit, and a long delay can require updated documents or requalification. Single-closing loans also operate within time limits, so confirm the schedule with your lender. The investor won’t buy the loan until the home is complete.
For your own numbers, request a scenario review with Lendmire.
About Lendmire
Lendmire — NMLS# 2371349 — is a mortgage broker that arranges FHA, VA, conventional and jumbo home purchase and refinance financing in 16 states through wholesale lenders. Every option is subject to the lender’s guidelines and full underwriting. Scotsman Guide named Lendmire a Top Mortgage Workplace in both 2025 and 2026.
Get Started
Ready to find the right loan for you?
In about two minutes you can review financing options available for your home or investment property. No commitment required.
Informational only. Not a Loan Estimate, approval, or commitment to lend. Program availability and eligibility are subject to lender guidelines, credit approval, property review, and underwriting.
References
1. Fannie Mae Eligibility Matrix
2. Fannie Mae Learning Center: Construction-to-Permanent Financing
3. Freddie Mac Guide section 4602.2
4. Fannie Mae Announcement SEL-2022-02
This article is part of Lendmire’s conventional loan program — full qualification details, guidelines, and scenarios live on the program page.
Related reading: How to Raise Your Conventional Loan Approval Odds Before Applying · Conventional Loan vs USDA Loan for a Buyer in a Rural Area · Do You Need a Conventional Loan Pre-Approval for New Construction?
Brandon Miller
Founder & CEO, Mortgage Loan Originator, Lendmire LLC
- Mortgage Loan Originator · NMLS# 1129696 · Verify on NMLS Consumer Access
- North Carolina Real Estate Broker · License# 343312 · Verify on NCREC
- North Carolina Insurance Producer · License# 19053198 · Property, Casualty, Life, Health · Verify on NAIC SBS
- Lendmire LLC · Firm NMLS# 2371349 · Verify firm licensure
Compliance and disclosures. Lendmire (NMLS# 2371349) is a licensed mortgage broker and is not a direct lender, depository institution, financial advisor, or tax professional. Content in this article is general market analysis and educational information — not financial, legal, or tax advice for any specific situation. Lendmire does not guarantee loan approval; every transaction is subject to underwriting by the funding lender. Mortgage pricing and loan program guidelines are subject to change at any time without notice and vary by borrower characteristics, property type, and state regulations. Lendmire complies with Equal Housing Opportunity. Licensure verification: NMLS Consumer Access.